Project Update

Dear Purchasers

We are all very aware of the current ever evolving climate and the continued uncertainty surrounding the impact from the COVID-19 virus on the anticipated completion of your new home or investment.

We’ve been diligent to ensure that our construction portals is up to date and that any information is quickly passed on when given to us by our vendor clients. We understand that this may change over the ensuing months. To mitigate this we’ve reached out to all our clients this week asking them to let us know asap of the personal impact towards each construction site or marketing phase for your particular project

Please be assured that we will continue to monitor the consequences (if any) and pass on any relevant information with regards to settlement, construction delays or any matters that impact your important purchase, right here on our construction portal.

As always, in the interim our concierge service is here (on the hours below) to take your calls or inquiry

Please note our Concierge hours are:
11am-3.30pm on Mondays and 9.30 -1pm Tuesdays and 11am – 4pm Thursdays.

Thanks for both your patience and understanding.

Amy

+ View More

1975

1975 Malvern Road
Malvern East
Builder:First Construction
Project Manager:BHC Group
Anticipated Completion Date:Q3 2021
Anticipated Settlement:Q3 2021

Project Update

July, 2020

Demolition is complete at 1975 Malvern East.

First Construction has been appointed as the builder.

Construction is due to start in a few weeks’ time. We are waiting for the relevant permits to be issued.

Further updates to come from the developer in due course.

+ View More

71 Station Street

71-73 Station Street
Fairfield
Builder:Halecorp
Project Manager:Codicote
Anticipated Completion Date:Q3 2021
Anticipated Settlement:Q3 2021

Project Update

June, 2020

The developer advises that the builder has been appointed, and is anticipating 16 months build time to commence by end of this month. Further updates to come in due course from the developer.

818 Caulfield Residences

818 Glenhuntly Road
Caulfield South
Builder:Cobild
Project Manager:Urban DC
Anticipated Completion Date:July 2020
Anticipated Settlement:July 2020

Project Update

July, 2020

Settlement is triggered. Please contact Jackie with regards to any settlement queries.

Jackie Zandveld
T: 0438 812 800
E: jackie@urbandc.com.au

 

835

835 High Street
Armadale
Builder:Flux
Project Manager:TBC
Anticipated Completion Date:Q3 2021
Anticipated Settlement:Q3 2021

Project Update

April, 2020

We are pleased to pass on the below update from the developer:

We’re obviously living in a very unusual and challenging environment at the minute and we hope everyone is looking after themselves and supporting each other through it.  Whilst things are changing daily, we thought it’d be an appropriate time to provide an update in relation to 835 High.  

Firstly, we’re very excited to be able to announce that we’ve appointed Flux (Figurehead Construction) as our Builder/Head Contractor.  Flux were the builder on our recently completed 97 Mathoura Rd, Toorak development which was also designed by Carr and has recently been shortlisted for the prestigious Australian Interior Design Awards.  Flux have an unrivalled reputation for delivery of extremely high quality developments and we couldn’t be more confident in their ability to deliver another outstanding result for us all at 835. 

Link to Flux website – http://www.fluxconstruction.com.au/

Link to our completed Mathoura Rd Development (Moda/Carr/Flux) – https://www.moda.com.au/97-mathoura-road-toorak/

Flux have already commenced demolition on site with the internal strip-out phase well underway and will roll straight into construction unless there are further State/Federal restrictions put in place to prevent them from doing so.  As of today, the construction industry continues to operate, albeit under some modified working conditions.  

From a sales perspective, we’ve now sold 23 of 26 Apartments which is an incredible outcome (so quickly) and reflects the quality of the design and location. 

Our business and more specifically this development is extremely well capitalised and nicely positioned to deliver 835 High and we look forward to keeping you regularly updated as we progress through construction.  

If anyone would like to discuss anything at all, please feel free to email or call, we’re available at any time. 

Lastly and more importantly we hope you’re all staying safe and keeping healthy.

 

+ View More

Aintree Park

1432-1436 Malvern Rd
Glen Iris
Builder:Samssons Projects
Project Manager:TBA
Anticipated Completion Date:Early 2021
Anticipated Settlement:Early 2021

Project Update

May, 2020

Piling is underway and the anticipated completion date at this stage is early 2021.

Photos and further updates to come from the developer in due course.

Anderson Park

585 Burke Road
Hawthorn East
Builder:Ironside
Project Manager:Nash Project Management
Anticipated Completion Date:Q2 2021
Anticipated Settlement:Q2 2021

Project Update

June, 2020

Further May Update for Anderson Park:

Construction Update:

  • We have reached the bottom of the excavation
  • Contractor is digging for footings
  • Commencing in-ground services installation
  • Crane is scheduled for installation next weekend (6 Jun)

Works going as well as could be hoped for. No issues encountered in the ground. Contractor slightly ahead of programme, still on-track for delivery in May 21.

Project unaffected by Corona virus as yet – construction industry remains an essential service. Builder is doing their best to ensure distancing on-site and within facilities as well as increased the frequency of cleaning they undertake.

+ View More

Balwyn Park

7 Cherry Road
Balwyn
Builder:Cobuild
Project Manager:M2mg
Anticipated Completion Date:Q2 2021
Anticipated Settlement:Q2 2021

Project Update

June, 2020

The following update has been provided to us by the developer;

Currently the construction application and other associated permits are still sitting with Booroondara City Council. We are constantly chasing up council and hope to have news soon.

We apologize for the delay and will keep you posted as soon as we know more.

+ View More

Beckworth

184-186 Tooronga Road
Glen Iris
Builder:Harris HMC
Project Manager:Point Polaris
Anticipated Completion Date:Ealry 2021
Anticipated Settlement:Early 2021

Project Update

June, 2020

Construction continues on site. Completion at this stage is anticipated to be late 2020/ early 2021.

Further updates to come from the developer in due course.

Bespoke

1394 Malvern Road
Glen Iris
Builder:Manresa Constructions
Project Manager:TBA
Anticipated Completion Date:Late 2020
Anticipated Settlement:Late 2020

Project Update

May, 2020

Please see the below update including the activities completed, and few photos for reference.

  •  Ground floor AFS walls 100% complete
  •  Ground floor suspended slab poured
  • Ground floor carpark entry slab poured
  • Ground floor concrete columns poured
  • Malvern Rd scaffold erected to level 1
  • Level 1 transfer slab & down turn beam pour scheduled 30/04
  • Service rough in to level 1 floor slab

The developer will provide further updates in due course.

+ View More

Bloom

1240 Glen Huntly Road
Carnegie
Builder:Nantong Construction
Project Manager:Conrock
Anticipated Completion Date:Late 2020
Anticipated Settlement:Late 2020

Project Update

June, 2020

As previously advised we have ceased involvement with the Bloom development , with the exception of updates on our construction portal.

The builder has recently advised us, as the new images recently uploaded show, that all five levels are up and the internal fit out is underway.

At this stage the developer has advised that a completion date is anticipated to be the end of 2020.

We have been advised that builders onsite are taking precautions to work under safe conditions regarding Covid-19, and that this has slowed work somewhat but that work continues onsite.

For those who require additional information , the builder (Sam) is available on site to assist with most queries

+ View More

Botanical

16 Spring Road
Malvern
Builder:Hamilton Marino
Project Manager:Land Real
Anticipated Completion Date:October 2020
Anticipated Settlement:November 2020

Project Update

July, 2020

The developer advises the following:

Unfortunately, further delays due to the pandemic have and continue to be felt, are beyond anyone’s control and the most current estimate for completion of the apartment building is now October with a move in date of November.

An August completion continues to be dependent upon how the COVID-19 situation unfolds and further delays may occur.

Further updates to come from the developer in due course.

 

 

+ View More

Broadway

630 Glen Huntly Road
Caulfield South
Builder:Holm Park
Project Manager:INPG
Anticipated Completion Date:Late 2021
Anticipated Settlement:Late 2021

Project Update

June, 2020

Holm Park Builders have been appointed. Construction soon to be underway.

At this stage we are anticipating completion Mid 2021.

Further updates and images to come in due course.

 

Carrington

101 Carrington Road
Box Hill
Builder:D5
Project Manager:BHC Property
Anticipated Completion Date:Late 2021
Anticipated Settlement:Late 2021

Project Update

June, 2020

Demolition is now completed. Construction will start 01.07.2020

The developer will be in touch in due course with further updates.

Completion date late 2021.

Central Park

2A Nyora Street
Malvern East
Builder:Figurehead
Project Manager:Pax Project Management
Anticipated Completion Date:Q4 2020
Anticipated Settlement:Q4 2020

Project Update

April, 2020

We are pleased to confirm that work continues to progress onsite, with Figurehead following all Government advice relating to the COVID-19 situation. Currently we do not foresee any change to the estimated completion timeline however we will of course keep you updated should circumstances change.

At this stage the basement excavation is complete, and the rainwater tanks have been installed below the basement slab. The basement concrete walls and base slab have now been poured with the ground floor concrete suspended slab now 50% poured – the remaining 50% is to be poured in the next two weeks. The next two weeks will also see the concrete walls and columns, already installed within the basement, continuing above ground floor.
Over the coming months structural works will continue with level 1 and 2 slabs to be poured as well as the top floor roof structure. We are aiming for the building to be “topped out” in late May/June. The internal services fit out will follow with the individual apartments beginning to take shape!

Included within the next project update will be information regarding our recommended window furnishing supplier and how to arrange quotes and install directly with them.

Please look out for our next Central Park update in July.

Jackie Zandveld
Settlement Coordinator
T: +61 438 812 800
E: customercare@roulston.com.au

+ View More

Daracombe

369-371 Cotham Rd
Kew
Builder:Pulitano Commercial Construction
Project Manager:TBA
Anticipated Completion Date:Q3 2021
Anticipated Settlement:Q3 2021

Project Update

May, 2020

We are pleased to pass on that the builder has been appointed for Daracombe. Pulitano Commercial Construction will build your new homes.

Further news and construction updates to come from the developer in due course.

 

East End Ringwood

30 Maroondah Highway
Ringwood
Builder:TBC
Project Manager:TBC
Anticipated Completion Date:Q1 2023
Anticipated Settlement:TBA

Project Update

June, 2020

We are currently in the sales and marketing phase.

Whilst sales are occurring the development team is in discussions with builders and banks to bring East End Ringwood to life.

Construction updates will be provided quarterly.

+ View More

East Village Prahran

283-289 High Street
Prahran
Builder:Method Constructions
Project Manager:Prince Corporation
Anticipated Completion Date:Mid 2021
Anticipated Settlement:Mid 2021

Project Update

June, 2020

We are advised by the developer that Method Constructions has been appointed as builder. The co-directors who are actively involved with all aspects of the delivery process collectively bring over 50 years of experience in the construction industry.

As we progress through construction, the developer looks forward to bringing you regular updates of this exciting project and sharing the journey with you.

Construction started – move in mid 2021.

+ View More

Eastbridge

833 High Street
Kew East
Builder:D5 Building Group
Project Manager:BHC Property
Anticipated Completion Date:Late 2020
Anticipated Settlement:Late 2020

Project Update

June, 2020

We are pleased to pass on the following update from the developer:

With the colder weather settling in, construction work has not stopped on site.
The team at D5 have made fantastic progress with some of the project milestones to date summarised as below:

  • External claddings, windows and glazing installation is at 100% completion
  • Services rough is at 90% completion
  • Internal plasterboard and fixing installation is at 85% completion
  • Internal doors installation at 65% completion
  • Walk-in robes, linen shelves, tiling to bathrooms at 35% completion
  • Kitchen and bathroom joineries are currently in the production process in Italy and due to arrive in the coming months

Construction completion is anticipated to be in early November 2020. We anticipate settlement to take place sometime late Nov to early Dec 2020.
Please note as always timings are always anticipated and an exact settlement date will not be known until the Plan of Subdivision has been registered with the Titles Office and the Certificate of Occupancy achieved, and settlement is called.

It is recommended to commence the finance process now if you require one. Please do not underestimate the amount of time required to complete the finance process to ensure you are organized for a smooth and timely settlement.

The builder, D5 noticed from the CCTV footage that there has been unauthorised site access after hours. For safety reasons, please DO NOT access the site.  There are very steep fines in place across Australia for instances where people without the necessary authorisation enter construction sites. If you get caught unsupervised (or worse, get injured) on the site the builder could easily cop a massive fine. If you enter a building site without permission, the builder has the right to remove you.

We are pleased to attached photos taken from the site this week, showing the progress to date.

+ View More

Gardenia Park

8 Genista Avenue
Boronia
Builder:Batbuild
Project Manager:BHC Property
Anticipated Completion Date:April 2021
Anticipated Settlement:April 2021

Project Update

June, 2020

The developer advises that the following progress achieved on site to date for Gardenia Park:

–          Underground electricals – 100% completed

–          Concrete slab 70% completed

–          Termite protection 50% completed

–          Drainage/Plumbing – 40% completed

–          Framing is anticipated to commence in few weeks time

Project completion is anticipated to be achieved by April 2021.

We are pleased to attache photos taken from the site this week, showing the progress of the groundworks to date. The developer will keep you updated on progress in the coming months and look forward to sharing regular updates on your future home at each milestone reached.

+ View More

Glenarm Square

1 Glenarm Road
Glen Iris
Builder:Hamilton Marino
Project Manager:TBC
Anticipated Completion Date:December 2021
Anticipated Settlement:December 2021

Project Update

June, 2020

Please find the latest update below from DealCorp.

DealCorp is delighted to announce that industry leader, Hamilton Marino Builders are appointed as builder at Glenarm Square. They anticipate that work will commence onsite in the second half of 2020.

They are looking forward to keeping you informed as construction progress onsite.

If you have any enquiries in the interim please contact the Brett Hallam on 0418 318 283 or bhallam@dealcorp.com.au

Settlement
Settlement often fast approaches and it is never too early to be organised with finance. DealCorp encourage you to touch base monthly with your bank or broker and discuss your personal requirements and circumstances. If you would like us to recommend a preferred finance broker we will gladly do so. Please email customercare@dealcorp.com.au noting your lot number and name.

 

+ View More

Greenwell

597 Burke Road
Camberwell
Builder:Creation Homes
Project Manager:Pomeroy Pacific
Anticipated Completion Date:Late 2021
Anticipated Settlement:Late 2021

Project Update

July, 2020

Construction commencing next month.

Further Updates to come from the developer in due course.

Helm

300 Burwood Road
Hawthorn
Builder:FourSquare
Project Manager:TBA
Anticipated Completion Date:November 2020
Anticipated Settlement:November 2020

Project Update

June, 2020

Please find the latest update below from the developer:

Dear Helm Apartment Owner,

Since our Construction Update No. 8, issued on 26 March 2020, while the site itself may have been fairly quiet, behind the scenes we have been working tirelessly and a lot has been happening.

We have been completing negotiations with Suppliers to secure unhindered supply of the products ordered to finish the Project, both those coming from within Australia and those from overseas, and also engaged further fencing and security monitoring to ensure the safety of the site and your investment during the transition in Builders.

We are now very pleased to advise that FOURSQ (pronounced FourSquare) have been nominated as the new Builder for HELM.  They have an excellent portfolio of past projects, where they have been instrumental in successfully assuming the builder role on several of those developments that were facing the same challenges when they came on board, and the results they delivered have been seamless and of the utmost quality.  We wanted to select a New Builder who is both capable and worthy of the job to complete the HELM build to our high expectations, which has not been an easy task, but we believe that we have been successful in this endeavour.

Taking the extra time to do the necessary due diligence to be able to be confident in our selection of FOURSQ has been crucial to try and ensure a smooth finalisation schedule for the remainder of the build, and we believe that this will mean a superior quality end-finish to the Apartments will be delivered that will be worth the wait.

FOURSQ are expecting to resume building works in the next two weeks, and have presented a Completion Timeline that has Apartments being completed around the end of October 2020, with Settlement then anticipated to be able to take place some time in November.  Please find attached for your reference the Completion Works Tender Timeline dated 24 April 2020, showing a Projected Hand-over Date of Friday 2/10/2020 to Tuesday 24/11/2020.

As mentioned, the Completion Date as set out in the Builder’s Construction Schedule is to be around the 1st November 2020.

We will be in touch shortly with the amendment to the Purchase Contract.

Thank you very much for your patience in this matter and, like you, we are looking forward to moving into our Apartment.

 

 

+ View More

Hotham

99 Hotham Street
Balaclava
Builder:Paragon Development Group
Project Manager:Paragon Development Group
Anticipated Completion Date:Feb 2021
Anticipated Settlement:Feb 2021

Project Update

May, 2020

The developer has advised that for the month of April, they have been installing the underground sewer & stormwater services to the main block of Townhouses at Balaclava.

This work will carry through the month of May including the electrical services.
They will also start the structural footings and load bearing structure for the ground floor to the North facing townhouses.

This includes running all major services (water, gas, electricity) below the ground floors.

They will also be working in the front four units, pouring the slabs and basic infill timber framing.

They have advised they are utilising a pre-fabricated wall & floor system that is delivered to site with the windows installed and some external claddings on. (not the feature cladding). Frames are ordered and are due to start erecting on site from early June.

This process is expected to expedite the build significantly, with the manufacturer estimating they will erect a complete three level townhouse including roof trusses within a week.

Our aim is to have all townhouses locked up in October 2020.

Further updates to come.

+ View More

Hudson Green

6 Hudson Street
Caulfield North
Builder:Shustin
Project Manager:Shustin
Anticipated Completion Date:Q4 2020
Anticipated Settlement:Q4 2020

Project Update

May, 2020

Through this challenging time we have been able to progress and complete our roof and are closing in on completing our external claddings.

Over the next few weeks we will be focusing on the finishing touches externally, with render colours, caulking and capping’s before we remove the scaffolding around the building.

Internally, first floor services are almost complete – being plumbing, electrical, heating and cooling – and we are commencing to lock up on the ground floor with the intention of commencing plaster in the next few weeks.

In addition to maintaining a steady progress, our priority is to ensure that we maintain safe work practices and promote social distancing on site.

Photos included show the progress of the site.

Should you have any queries please contact us on 9530 6800 or info@shustin.com

 

+ View More

Lothian Street

141 Arden Street
North Melbourne
Builder:Bear Projects
Project Manager:Exelon Projects
Anticipated Completion Date:August 2020
Anticipated Settlement:Q3 2020

Project Update

May, 2020

Progress continues to progress well at Lothian Street. We are pleased to pass on the following purchaser update for Lothian Street as provided to us from the developer. Please see photos attached.

By early-May, our progress is as follows:
• Structure complete
• Brickwork complete
• Arden Street and Little Lothian Street scaffolding removed
• Mechanical units being installed
• Windows being installed
• Internal finishes being installed

Please note the following regarding the Covid-19 crisis:

  • The supply chain of the Fenix NTM finish for kitchen

    joinery, an Italian product, has been disrupted by the

    Covid-19 lockdown in Italy.

  • An alternative joinery finish for the kitchens has been

    selected by the architect in response to this logistics disruption. Please refer attached letter from Kennedy Nolan for more information.

  • We have also been informed by the builder of a potential delay in delivery of lifts, which are also being sourced from Italy.

We will endeavour to provide you with further updates as construction progresses.

+ View More

Luar

22-24 Pakington Street
St Kilda
Builder:Drakk Constructions
Project Manager:David Parsons
Anticipated Completion Date:Q2 2021
Anticipated Settlement:Q2 2021

Project Update

July, 2020

The developers have provided us with the following update:

We are pleased to advise that we have passed the most challenging and unpredictable phase of the construction.

As advised previously, all of the low grade contaminated fill has been removed. The next challenge was to deal with the water table.

This part of St Kilda was originally a swamp. The fill was bought in to lift ground level above the water level. Consequently, the water table is not far below the surface and is a significant challenge both during construction and to construct dry basements.  In order to achieve this, we have laid boreholes fed by trenches from all over the site (see the photo attached). These bores are constantly pumped to settlement tanks before discharging to the storm water system.

Further photos show the positioning of reinforcement in the final structural footing.

The next stage is to pour a hydrostatic slab. This is a very thick, heavy slab which will assist in ensuring that the basement doesn’t literally float up on the water table.

The hydrostatic slab will be poured in the next week or so. From there, construction will be virtually without risk and should proceed without further delay.

We are currently targeting a construction completion date in mid July, 2021

We will further update this page in due course with photos and construction updates. Thanks for your patience.

 

 

+ View More

Luminess

27 Russell Street
Essendon
Builder:TBC
Project Manager:TBC
Anticipated Completion Date:Q3 2021
Anticipated Settlement:Q3 2021

Project Update

July, 2020

We have been provided the following update from the developer:

We continue to work with the council’s planning department to hopefully receive endorsed plans this month.

The announcement of our preferred builder should also be at a similar time frame as they finalize negotiations with their sub-contractors this month also.

 

+ View More

Melfort

496 Glenferrie Road
Hawthorn
Builder:Pulitano Commercial Construction
Project Manager:TBA
Anticipated Completion Date:Q2 2021
Anticipated Settlement:Q2 2021

Project Update

June, 2020

The status of construction is that Pulitano Construction has been appointed. Demolition is now complete.

Construction has commenced on site. Piling has commenced.

Further update to come from the developer in due course.

 

Olea

50 Kambrook Road
Caulfield North
Builder:Balmain & Co
Project Manager:BNG Group
Anticipated Completion Date:2021
Anticipated Settlement:2021

Project Update

June, 2020

We are pleased to pass on the following update from the OLEA group:

“We are pleased to announce that we have decided to appoint Balmain&Co. to be the builder of Olea Residences (44-54 Kambrook Rd, Caulfield North)

The date of construction commencement  will then be advised by the builder. We will surely keep you posted once we’ve had a solid confirmation.

Construction will be commencing mid 2020 with the anticipated completion date to be end of 2021′”.

As previously advised Marshall White Projects is no longer the sales agent for OLEA however the project will however remain on our construction portal with quarterly updates supplied by BNG group.

In the interim, we invite you to communicate BNG group on 1300 853 761 and ask to speak to Dina or email: Oleasales@bng.group for additional information.

 

+ View More

Parq

134-138 McKinnon Road
McKinnon
Builder:Fynnan Construction
Project Manager:Oxford Developments
Anticipated Completion Date:Mid 2021
Anticipated Settlement:Mid 2021

Project Update

May 27th, 2020

Purchasers, please see the letter below from Kallan Carabott, Director of Oxford Development Group.

Dear Purchasers,

I am sorry for the delay in our commencement of PARQ.

We demolished the existing buildings late last year with a March 2020 start date as our goal, unfortunately COVID-19 has created delays we could never prepare for, social distancing through my own office, our consultants reduced work hours and a shortage of work ready sub-contractors forced us to temporarily put the brakes on the project.

I am delighted to say that things are a lot better now in the building industry and things are back on track, however still slower than normal. At the moment we are confident we will be able to commence construction in 6-8 weeks’ time.

Thank you for your patience.

Kallan Carabott
Director

+ View More

Profile

1443 Dandenong Rd
Malvern East
Builder:Goldfields
Project Manager:M2
Anticipated Completion Date:Q2 2021
Anticipated Settlement:Q2 2021

Project Update

May, 2020

We are pleased to pass on that the developer has appointed Goldfield as the builder and construction to commence end of May- first week of June. Everything is ready to go and we are excited to commence.

Further updates to come in due course.

JL Property Development

 

+ View More

Rose & Bird

30 Rosamond Rd
Maribyrnong
Builder:Creation Homes
Project Manager:TBA
Anticipated Completion Date:Early - Mid 2021
Anticipated Settlement:Early - Mid 2021

Project Update

May, 2020

The team at Metro Property Development are excited to provide you with our first construction update for Rose & Bird, Maribyrnong as well as some updated site photos.

Whilst we are all currently faced with a number of restrictions on our daily lives, construction sites remain open and civil works are well under way at Rose & Bird. We are expecting housing construction to commence early in the second half of the year with homes settling progressively from early 2021 to mid 2021.

During the course of construction we will endeavour to provide you with a construction update on a bimonthly basis. As you would appreciate, our construction program and expected settlement dates may be impacted by future work restrictions.

As works progress, we will introduce you to our settlements team who will take you through the settlement process and provide you with all the necessary information required to take possession of your new home.

Construction updates will be provided quarterly.

+ View More

Royal Ascot

2 Mascoma Street
Ascot Vale
Builder:Marcus Group (A subsidiary of ABD Group)
Project Manager:Pomeroy Pacific
Anticipated Completion Date:July 2020
Anticipated Settlement:July 2020

Project Update

June, 2020

• Valuation inspections from Mid-June 2020
• Pre-settlement inspections: from Mid-June 2020
• Call Settlement-around 1st of 2nd week of July. 2020

At this stage we are advised that Settlement itself will be most likely for early July 2020

Please note that there is a construction camera installed opposite the site which is relaying real-time photos online.  The construction camera can be viewed anytime at royalascotresidences.com.au.

Currently we are on target to achieve Practical Completion in June and encourage you, if not already done, to prepare for settlement.  We will ensure to keep you updated on construction as we near settlement.

Please do not hesitate to contact Tania from Property Settlement Solutions on (03) 8582 8973, or email tania@settlement-solutions.com.au if you have any queries about your upcoming settlement.

We wish you and your family to keep well over this difficult period.

+ View More

St James Park

1A Yarra St
Hawthorn
Builder:Marcus Group
Project Manager:TBA
Anticipated Completion Date:Q1 2021
Anticipated Settlement:Q1 2021

Project Update

May, 2020

We are pleased to announce that construction at St James Park has been progressing well, with a number of significant project milestones recently achieved.

Those passing the site will have noticed the dramatic architectural built-form of St James Park now reaching completion. With the structure in place the installation of mechanical services such as air-conditioner ducting, gas and electrical wiring can commence.

The set-out of internal walls is also well underway, following which the installation of windows to Level One will commence.

Externally, the powerlines fronting Burwood Road have been dropped underground, ready for fibre-optic cables to be laid and the remaining poles removed.

Finally, the coming month will see the removal of the crane on site ready for internal fit outs to commence.

We are targetting Q1 2021 for Settlements.

 
 
+ View More

Surrey Gardens

288 Canterbury Road
Surrey Hills
Builder:Stosius Constructions
Project Manager:Nicky Keating
Anticipated Completion Date:Late 2020
Anticipated Settlement:Late 2020

Project Update

June, 2020

Please see below the construction update provided from the developer:

Progress for Surrey Gardens is on track as we continue to reach key milestones on time.

Concrete Works are completed.
Services shop drawings are completed.
Services works at site are completed.
Plastering Works are completed.
Light weight wall frames / Roof trusses To be delivered 15th June 2020.

We are all very aware of the current ever evolving climate and the continued uncertainty surrounding the impact from the COVID‐19 virus on the anticipated completion of the project.

Please be assured that we will continue to monitor the consequences (if any) and pass on any relevant information with regards construction delays.

Thanks for both your patience and understanding.

+ View More

Tailor

481-491 Victoria St
West Melbourne
Builder:Manresa Constructions
Project Manager:TBA
Anticipated Completion Date:May 2021
Anticipated Settlement:May 2021

Project Update

May, 2020

We wish to pass on the following update from the developer:

– Services have been disconnected.
– Internal demolition started 4 weeks ago.
– External demolition will be complete by the end of the first week of May
– Bulk excavation for the basement is due to start during the middle of May

Expected completion date of Q2 2021

Construction updates will be provided quarterly.

+ View More

Ten to Twelve

10- 12 Lindsay Street
Brighton
Builder:Cobild
Project Manager:Hub PG
Anticipated Completion Date:December 2020
Anticipated Settlement:December 2020

Project Update

June, 2020

The developers advise us that they have begun Authority upgrade works at 10-12 Lindsay Street in the past few weeks and still have a few other Authority items which they need to complete before we can start construction onsite. They will be able to confirm the start date shortly.

Please see attached recent photos taken of site.

Further updates to come from the developer.

+ View More

The Kent

382 Burwood Rd
Hawthorn
Builder:Cobild
Project Manager:HS Consortium
Anticipated Completion Date:October 2020
Anticipated Settlement:October 2020

Project Update

May, 2020

Progress continues with some delays due to the implementation of social distancing restrictions on site. The Façade, Plastering and Joinery are now almost complete, installation of flooring and tiling is very close behind and appliances have now been installed from levels 1 to 3.

Completion is now on track for October with settlements to follow.

Financing

Loans or funds ready for your purchase? Great news! If not, you may need to contact the recommended Mortgage Broker for The Kent purchasers.

HS Consortium would like to recommended Mortgage Broker- Nic Don of Odyssey Financial has over 30 years’ experience in finance and is ready to assist you with your loan requirements, what’s more he very familiar with our development.

Nic will –

  • Assess your personal situation and provide advice in relation to the best borrowing structure and loan type
  • Arrange home loans from 2.09% and Investment loans from 2.49%
  • May even be able to improve your current rates from your own bank
  • Manage your loan application, valuation, approval and loan documentation -Without any brokerage fees
  • Manage a smooth and on time settlement with your solicitor, the banks solicitor and vendors solicitor

Please contact Nic Don- CEO – Odyssey Financial for a no obligation discussion regarding your finance needs – Call 0412 352 099.

In the meantime, please do not hesitate to contact Tom Hawkins from Property Settlement Solutions on 03 8582 8972 or email tom@settlement-solutions.com.au

We look forward to sharing further updates next quarter.

+ View More

Timeless

555 Burke Road
Camberwell
Builder:TBA
Project Manager:TBA
Anticipated Completion Date:December 2021
Anticipated Settlement:December 2021

Project Update

June, 2020

We are currently in the sales and marketing phase.

Whilst sales are occurring the development team is in discussions with builders and banks to bring Timeless to life.

Construction updates will be provided quarterly.

+ View More

Verse

18 -28 Wilkinson Road
Sunshine
Builder:Rise Constructions
Project Manager:Paragon Development Group
Anticipated Completion Date:Early 2021
Anticipated Settlement:Early 2021

Project Update

May, 2020

For the month of April, we have finished installing the stormwater tanks below both roads.
Services branches to each property have also been installed.
The sewer diversion is now complete, and City West Water are testing the asset next week.
For the month of May, we will start site cuts for the northern block of townhouses.
Start internal drainage, and possibly start preparation of the foundations and slabs.
Completion is anticipated to be early 2021.

 

+ View More

Wattle on the Park

2 Wattle Grove
McKinnon
Builder:Donmar
Project Manager:KBMV
Anticipated Completion Date:Early 2021
Anticipated Settlement:Early 2021

Project Update

May, 2020

Demolition has begun on site. Construction progress has slowed due to the impact of Covid-19 however we expect this to expedite again shortly.

We are pleased to announce that Donmar is the appointed builder. www.donmar.com.au

Thankyou for your patience and we will pass any further update on as we are provided it.

 

 

 

+ View More

Westend (Adderly, The Foundry, Spencer, Mailhouse)

185 Rosslyn Street
West Melbourne
Builder:Hacer
Project Manager:Urban
Anticipated Completion Date:Mid-Dec 2020
Anticipated Settlement:Mid-Dec 2020

Project Update

April, 2020

As advised in the February Project Update for West End, the completion dates for West End have been revised due to the obvious challenges associated with the coronavirus.

The current revised dates for settlement as advised by Hacer our builder are as follows:

Building

Practical Completion
and Revised Settlement Dates as at March 2020 Settlement Date

2 – Adderley

Mid November 2020

3 – Mailhouse

Mid December 2020

4 – Foundry

Mid November 2020

5 – Spencer

Mid December 2020

The key reasons for the revised dates are:

  1. Delays in receiving building materials from abroad, and most significantly,
  2. Loss of productivity due to revised and progressive revisions to-site work practises which is also subject to ongoing review by the State Government and Unions.

Please ready yourselves for settlement and we are pleased to advise that the organisation Property Settlement Solutions will be assisting with your settlement needs so please look for the email very shortly.

We understand that some purchasers have been planning for a settlement date that has now been moved back and we have received enquiries from various purchasers looking for an interim home whilst their final apartment homes are ready for occupation.

Subject to confirming numbers, the Adina Apartment Hotel may be ready to receive guests from the 1st September 2020.

 

+ View More

For further enquiry or any issues, please contact:

Amy Bennison
Email : amy.bennison@marshallwhite.com.au
phone : 03 9832 1278

Please note our Concierge office hours are:

9.30 – 4.30pm on Tuesdays and Thursdays, and from
9.30 – 3pm on Mondays.

X

X

Register for instant email alerts when a property matches your criteria.