It looks like we are still missing some information to finalise your profile. Please enter your phone number below to complete your account set up.

1975

1975 Malvern Road
Malvern East
Builder:TBA
Project Manager:BHC Group
Anticipated Completion Date:Q3 2020
Anticipated Settlement:Q3 2020

Project Update

September, 2019

We are currently in the sales and marketing phase.

Whilst sales are occurring the development team is in discussions with builders and banks to bring 1975 to life.

Construction updates will be provided quarterly.

+ View More

232 Wattletree

232 Wattletree Road
Malvern
Builder:Cobild
Project Manager:Neoscape
Anticipated Completion Date:September 2019
Anticipated Settlement:October 2019

Project Update

September, 2019

We are drawing closer to completion of 232 Wattletree, with all major components of the build now complete.

Kitchens are coming to life with all stone benchtops installed, and Cobild are finishing off custom joinery elements. The exterior elements of the building have been a strong focus this month, with the copper cladding now complete, and external balustrades and privacy screens installation underway.

As you may be aware, two things are required to formally classify your new property as completed in order for settlement to take place. The first is a Certificate of Occupancy that is issued from the building surveyor, and the second is the Plan of Subdivision which must be registered with the Land and Property Information Office.

Our next update is scheduled for issue next week and will contain information on access to site for bank valuation purposes.

In the meantime should you have any queries on the process ahead or timing please do not hesitate to contact Pip Wright on 0417 998 511.

+ View More

71 Station Street

71-73 Station Street
Fairfield
Builder:Brompton
Project Manager:Codicote
Anticipated Completion Date:Q4 2020
Anticipated Settlement:Q4 2020

Project Update

August, 2019

Project Progress

  • Demolition is now complete.
  • Anticipated construction start time is Q4, 2019.

Sales
For purchaser enquiries, please contact Marshall White Projects – Ranko Cvjeticanin, 0451 153 833.

To ensure the community of No.71 Station St is aware of the progression of this exclusive development, there will be quarterly updates to each of the residents for general progression and information.  If you have any questions, please feel free to get in touch.

+ View More

818 Caulfield Residences

818 Glenhuntly Road
Caulfield South
Builder:Cobild
Project Manager:Urban DC
Anticipated Completion Date:July 2020
Anticipated Settlement:July 2020

Project Update

August, 2019

Works onsite at 818 Caulfield Residences are progressing well, please see new photos attached of the current site in progress.

Completion of 818 Caulfield Residences remains on track for an anticipated settlement of approximately July 2020.

We will continue to provide you with updates of key milestones reached and firming up completion timelines, however please do not hesitate to contact Jenny Roche from Urban DC should you have any queries in the meantime jen@urbandc.com.au

 

+ View More

Aintree Park

1432-1436 Malvern Rd
Glen Iris
Builder:Samssons Projects
Project Manager:TBA
Anticipated Completion Date:Early 2020
Anticipated Settlement:Early 2020

Project Update

September, 2019

We are currently in the sales and marketing phase.

Whilst sales are occurring the development team is in discussions with builders and banks to bring Aintree Park to life.

Construction updates will be provided quarterly.

+ View More

Akora

5-7 Kooyong Road
Armadale
Builder:Ironside
Project Manager:Nash Management
Anticipated Completion Date:October 2019
Anticipated Settlement:October 2019

Project Update

September, 2019

Ironside have continued making great progress on site and based on this we are currently expecting an early October settlement period.

KIN Property will be your point of contact in the lead up to the settlement of your new residence.

The team at KIN, led by Jackie Zandveld, will be communicating with you over the forthcoming weeks, providing updates including information in relation to valuation access, pre-settlement inspections and handover procedures post settlement.

If you have any queries please contact Jackie Zandveld at akora@kinproperty.com.au or on +61 438 812 800.

+ View More

Altus

260 -262 Burwood Hwy
Burwood
Builder:Iurada Construction
Project Manager:BHC Property
Anticipated Completion Date:Late 2019
Anticipated Settlement:Late 2019

Project Update

September, 2019

We are pleased to provide you with the progress achieved on-site so far.

– Currently, the building is at lock-up stage.
– Windows have been installed on the ground and first floor.
– Ground floor plastering has been completed, first-floor plaster is half way through.

Currently anticipated construction completion before Christmas 2019.

In preparation for settlement, we advise all purchasers to start speaking to their bank & broker to organize settlement finance to suit this timeline.

We will keep you posted as we progress through the next phase.

 

+ View More

Anderson Park

585 Burke Road
Hawthorn East
Builder:TBA
Project Manager:Nash Project Management
Anticipated Completion Date:TBA
Anticipated Settlement:TBA

Project Update

September, 2019

The developer would like to let purchasers know that we have got a preferred contractor in place, and are planning to start the construction at the end of this year.

Arcadian

511 Dandenong Road
Armadale
Builder:Charles Edgar
Project Manager:Samssons Projects
Anticipated Completion Date:November 2019
Anticipated Settlement:December 2019

Project Update

September, 2019

The developer has advised that we are drawing closer to completion of Arcadian and things to continue to progress well on site.  Photos included show the progress of the Project over the last few months where kitchens are coming to life, bathroom tiling is underway, the external cladding is complete and it is anticipated that completion will be on track for November,  with Settlement prior to Christmas.

As you may be aware, two things are required to formally classify your new property as completed in order for settlement to take place. The first is a Certificate of Occupancy that is issued from the building surveyor, and the second is the Plan of Subdivision which must be registered with the Land and Property Information Office.

Our next update is scheduled for issue in November and will contain information on access to site for bank valuation purposes and the process to Settlement.

+ View More

Balmoral

1571 Malvern Road
Glen Iris
Builder:Cobild
Project Manager:Neoscape
Anticipated Completion Date:October 2019
Anticipated Settlement:October 2019

Project Update

September, 2019

Construction has continued to progress at Balmoral with interior detailing being a major focus, and custom joinery and tiling to wet areas commencing across all levels. Flooring and stone installation is now underway.

Our next update is scheduled for issue next week, which will include important information regarding settlement arrangements as the building approaches completion.

Valuation Access

Access for bank valuation purposes is anticipated to be available from early October 2019. Once the builder has confirmed access is available for valuations, we will issue correspondence confirming the process and the contact for your lender to book their appointment.

For any queries relating to Settlement please contact Pip Wright from the Fortis Development Team.
M  +61 417 998 511   •  E balmoral@fortis.com.au   •  W  www.fortis.com.au

+ View More

Balwyn Park

7 Cherry Road
Balwyn
Builder:TBA
Project Manager:TBA
Anticipated Completion Date:Q3 2020
Anticipated Settlement:Q3 2020

Project Update

September, 2019

We are currently in the sales and marketing phase.

Whilst sales are occurring the development team is in discussions with builders and banks to bring Balwyn Park to life.

Construction updates will be provided quarterly.

+ View More

Beckworth

184-186 Tooronga Road
Glen Iris
Builder:Harris HMC
Project Manager:Point Polaris
Anticipated Completion Date:Mid/late 2020
Anticipated Settlement:Mid/late 2020

Project Update

August, 2019

Harris HMC have been appointed as builders on the project. Demolition has occurred, and construction is expected to commence this month.

Anticipated completion at this stage is mid- late 2020.

We will update you further in due course.

 

Bespoke

1394 Malvern Road
Glen Iris
Builder:Manresa Constructions
Project Manager:TBA
Anticipated Completion Date:Late 2020
Anticipated Settlement:Late 2020

Project Update

August, 2019

Following construction contract negotiations, Catch Developments and Manresa Constructions will be signing the Head Construction Contract by the 15th of August.

Under the Letter of Early engagement, Manresa have begun mobilization of the site, including access and authority approvals from Local Power, Sewer,  Water and Yarra Trams for the necessary construction logistics.

These mobilsation works form under the building permit requirements prior to excavation with protection works and site establishment to follow and will be hopefully completed by the end of August for a September start on site.

**Subject to Authority Approval.

Construction is forecast to take 14 months so at this stage we are aiming for a late 2020 completion.

We look forward to updating you with further details in due course.

+ View More

Bloom

1240 Glen Huntly Road
Carnegie
Builder:Nantong Construction
Project Manager:Sam Segman
Anticipated Completion Date:December 2019
Anticipated Settlement:Late 2019

Project Update

August, 2019

Bloom Glenhuntly is pleased to report that construction on site continues to progress well with the structure now taking form.

Two basements, Ground, First & Second Floor are complete now and the team is working on to finish Level 3 & 4 in this month.
Plumbing, Electrical, Fire & Mechanical Services have started their works. Internal Finishing works started on Ground floor.

Bloom’s completion date is currently anticipated for December 2019 with settlement at the property expected to follow shortly after.

 

+ View More

Botanical

16 Spring Road
Malvern
Builder:Hamilton Marino
Project Manager:Land Real
Anticipated Completion Date:Mid 2020
Anticipated Settlement:Mid 2020

Project Update

September, 2019

The developer advises the following update:

  • Construction works progressed in August reaching level 2.
  • Works completed to date are progressing in accordance with the construction timetable.

 Construction updates will be provided quarterly.

 

+ View More

Central Park

2A Nyora Street
Malvern East
Builder:TBA
Project Manager:TBA
Anticipated Completion Date:Q4 2020
Anticipated Settlement:Q4 2020

Project Update

September, 2019

We are currently in the sales and marketing phase.

 Whilst sales are occurring the development team is in discussions with builders and banks to bring Central Park to life.

 Construction updates will be provided quarterly.

+ View More

East End

20 Canterbury Road
Blackburn South
Builder:Carelli Construction
Project Manager:JPS Projects
Anticipated Completion Date:October 2019
Anticipated Settlement:October 2019

Project Update

September, 2019

The projects construction phase has almost reached practical completion.

The team at Carelli Constructions have been making solid progress, and it is anticipated that the external landscaping will commence shortly. Internally the Ground Floor has seen the most progression, with timber flooring complete on level 1 & level 2.

The tiling is complete, with balcony pavers completed on level 1.

The kitchens together with all other joinery has been installed throughout the development.

Introducing Your Property Settlement Team

Your Property Settlement Team will be your point of contact leading up to the settlement of your property at East End.

The Property Settlement Team will provide you with regular updates, including information in relation to access for valuers and purchaser pre-settlement inspections as well as handover procedures post settlement.

Your Property Settlement Team contact is Tony Kenna who can be contacted on 0414 633 363 or via email tony@propst.com.au

If you have any queries please do not hesitate to contact Tony.

+ View More

East Grove

2a Kenilworth Grove
Glen Iris
Builder:Cobild
Project Manager:Neoscape
Anticipated Completion Date:Early 2020
Anticipated Settlement:Early 2020

Project Update

September 2019,

We are pleased to provide you with an update on the progress of your purchase within East Grove; 2A Kenilworth Grove, Glen Iris.

Cobild have completed the concrete pours to Level 1 and Level 2 with the Level 3 pour scheduled for this week.

Cobild have completed the lift shaft and stair core, which you can see in the image below.

We will continue to update you each month, as well as provide you with important information regarding settlement arrangements as the project approaches completion.

Should you have any questions relating to your purchase, please feel free to contact us.

+ View More

Eastbridge

833 High Street
Kew East
Builder:D5 Building Group
Project Manager:BHC Property
Anticipated Completion Date:Late 2020
Anticipated Settlement:Late 2020

Project Update

August, 2019

We are pleased to provide the latest update from the developer achieved on-site to date for Eastbridge.

– Bored piers and capping beams are all in.
– In-ground services installation has commenced.
– Vertical strip drains installation between bored piers underway.
– Bulk excavation currently at 65% complete.

The construction progress is 1 week ahead of schedule. Project completion for early December 2020 is on track. We are pleased to attached photos taken from the site this week, showing the progress of the groundworks to date.

We shall keep you updated on progress in the coming months and look forward to sharing regular updates on your future home at each milestone reached.

+ View More

Elwood Park

451-453 St Kilda Street
Elwood
Builder:Monaco Hickey
Project Manager:Armitage Jones
Anticipated Completion Date:May 2020
Anticipated Settlement:May 2020

Project Update

September, 2019

We are advised by the developer that construction has commenced, the project is progressing well and all is on track for anticipated completion in May 2020.

Construction updates will be provided quarterly.

 

Emerald Grove

66 Stanley Rd
Keysborough
Builder:Fynnan Construction
Project Manager:N/A
Anticipated Completion Date:Late 2019
Anticipated Settlement:Late 2019

Project Update

September, 2019

We are advised by the developer that the project is progressing well and all is on track and anticipated to complete towards end of this year. Please see the new pictures on site attached.

We will be in touch again in due course when timeline is confirmed.

+ View More

Form

21 Riversdale Road
Hawthorn
Builder:Cobild
Project Manager:Pax Project Management
Anticipated Completion Date:Q4 2019
Anticipated Settlement:Q4 2019

Project Update

September, 2019

The following is a Project update from the developer as we draw closer to the completion of 21 Riversdale:

The last 2 months on site have been extremely promising with the team gathering great momentum. Joinery and stone slabs are looking stunning and are now almost completely installed. Painting is well underway, timber flooring is being layed this week whilst tiling to bathrooms is close to completion.

As things come together the building is developing a fantastic feel to it. Great natural light & ventilation, wide corridors, natural exterior materiality and beautiful finishes internally. We’re really excited to show you through in November.
After lengthy discussions with Cobild and continual review of program, it is with a strong level of confidence (and great excitement) that we now believe that we will be complete and your apartment settled before Christmas.

As per the email update in August, there are still some small risks of delays (through council and titles) but we now have a strategy in place to mitigate these as much as we possibly can.

The settlement period is always a busy logistical time and we want to ensure that it is as smooth and enjoyable as it can be for you, and that’s why we’ve reached out to the experts to assist.

Across many projects, we have collaborated with Katrina from Settlement Solutions to help manage this process all the way through from administrative questions, timings, valuations through to organising your inspection and move in dates.

Hence we’d like to formally introduce Katrina Hope, who will be in touch with you shortly with an introduction email mapping out the settlement journey from here and provide you with any advice in this regard.

In the meantime, if you have any questions please feel free to email Nick: nick@moda.com.au

+ View More

Gardenia Park

8 Genista Avenue
Boronia
Builder:TBC
Project Manager:TBC
Anticipated Completion Date:Late 2020
Anticipated Settlement:TBC

Project Update

September, 2019

We are currently in the sales and marketing phase.

Whilst sales are occurring the development team is in discussions with builders and banks to bring Gardenia Park to life.

Construction updates will be provided quarterly.

+ View More

Helm

300 Burwood Road
Hawthorn
Builder:Buildcept
Project Manager:TBA
Anticipated Completion Date:May 2020
Anticipated Settlement:May 2020

Project Update

September, 2019

Please find the latest update below from the developer:

Welcome to the sixth of our updates of HELM Luxury Apartments, Hawthorn Construction Process.

Over the seven weeks since our last update, the progress on site has been astounding, which you can see from the attached updated photos as at Tuesday 27th August 2019.

The 3rd Level Floor has now been completed and, as you can see from the photos, Buildcept have commenced the “form-up” for the 4th Floor.  You cannot see the work being done in respect to the 4th level because of the set-back of Levels 3, 4 and 5.

We are now in a position to identify the form of the Building.  The form of Level 2 with the gracious curve is evident, and Level 3 will have the same curve.  There will be a different curve on Level 1 because there is a planter box that runs along the side of the Building commencing approximately where the curve starts on the second level ( shown in the main HELM rendered image at the top of our updates).

You can also identify the curve at the front corner of the Building, and the back corner of the Building (cnr Cook Street and Luton Lane).

As the Developer, I am very excited as to how the Building is going to look upon completion.  It is anticipated that the Building Structure will be completed by the end of September (as always, subject to weather).  Internally, Level 1 has already been stripped of its scaffolding supports and the internal fit-out has commenced.  The Ground Floor is also in the process of being stripped in readiness for fit-out.

We look forward to providing you further HELM Construction updates as the building continues to move rapidly ahead.  Please do not hesitate to contact us with any questions you may have.

If you are still investigating your finance options, we encourage you to contact Jarrod Hodges, Finance Manager at Hawthorn Finance, the multi-award winning lending and finance division of McLean Delmo Bentleys.

Please contact Jarrod to discuss your financing options on jhodges@mcdb.com.au, or on his mobile, 0447 596 436.

+ View More

Highgreen

1457 High Street
Glen Iris
Builder:Ironside
Project Manager:First Urban
Anticipated Completion Date:Mid 2020
Anticipated Settlement:Mid 2020

Project Update

September, 2019

Construction of 1457 High Street, Glen Iris continues to track along very well.

Current construction update includes:

  • Structure Completed
  • Roof install in progress
  • Framing for Ground Floor and Level 3 Completed, Framing for Level 1 and 2 in progress
  • Services Rough-in for Ground Floor Completed,  Services Rough-in for Level 1 in progress

Anticipated completion at this stage is Q1 2020.

 

+ View More

Hotham

99 Hotham Street
Balaclava
Builder:Paragon Development Group
Project Manager:Paragon Development Group
Anticipated Completion Date:Q3 2020
Anticipated Settlement:Q3 2020

Project Update

September, 2019

Demolition is complete and construction to commence this month. The Project management team has been working closely with the demolition crew to ensure that the last bit of demolition (at the front section of the building) is done correctly so that the heritage facade is maintained properly as to Council’s requirements. Please see photos of the site attached.

It is anticipated that project completion will be Q3 2020.

 

+ View More

Howard West

3-11 Howard Street
West Melbourne
Builder:Sinjen Pty Ltd
Project Manager:Pomeroy Pacific
Anticipated Completion Date:Early 2020
Anticipated Settlement:Early 2020

Project Update

September, 2019

Purchasers will be pleased to hear that progress is tracking according to schedule and is subject to approval of the final measure and subdivision plan by the authorities.

Plenty of new photographs are included here to show progress on site.

Schedule
There is no change to the schedule from the July 2018 update and completion is targeted for January 2020.

As progress continues, we will keep you informed of any changes to the schedule.

 

+ View More

Hudson Green

6 Hudson Street
Caulfield North
Builder:Shustin
Project Manager:Shustin
Anticipated Completion Date:Q4 2020
Anticipated Settlement:Q4 2020

Project Update

September, 2019

We are pleased to advise that construction on site at Hudson Green is going along incredibly well. The team have now moved from site preparation to basement retention works.

There is a big hole in the ground and the builders are progressing ahead of schedule. The site is buzzing with activity and the builder advises that it will be exciting to erect our precast core over the next few weeks. With the weather being kind to us we could see the basement slab complete by start of next month

Anticipated completion at this stage is late 2020.

Photos included show the progress of the cleared site.

Should you have any queries please contact us on 9530 6800 or info@shustin.com

 

+ View More

Jackson Street

11 Jackson Street
St Kilda
Builder:Cobild
Project Manager:James Beresford
Anticipated Completion Date:September 2019
Anticipated Settlement:October 2019

Project Update

September, 2019

We are pleased to advise you that the Plan of Subdivision for Jackson Street has been lodged at the Land Titles Office.

The builder anticipates that the Certificate of Occupancy is likely to be achieved in mid-September. Once this has been obtained and the Plan of Subdivision has been registered, settlement will be triggered and letters will then be sent to your legal representative, requiring you to settle your apartment within the allocated time frame.

You will have an opportunity to inspect your apartment prior to settlement.

We anticipate that these inspections will occur in the coming weeks. Please look out for a separate email, once we have confirmed dates.

Please contact Charlotte Cole from Property Settlement Solutions on

P: +61 408 119 994 with regards to any Settlement queries.

+ View More

Lawson

39 Lawson Street
Hawthorn East
Builder:D5 Building Group
Project Manager:BHC Property
Anticipated Completion Date:April 2020
Anticipated Settlement:Early - mid 2020

Project Update

September, 2019

We are pleased to provide you with the progress achieved on-site so far.

– The window frame is halfway through.
– Electrician rough-in will start in 2 weeks time.

We are currently estimating a construction completion before April 2020.

We will keep you posted as we progress through the next phase.

+ View More

Lothian Street

141 Arden Street
North Melbourne
Builder:Bear Projects
Project Manager:Exelon Projects
Anticipated Completion Date:August 2020
Anticipated Settlement:Q3 2020

Project Update

August, 2019

On the 10th July 2019 demolition works were completed and piling works commenced at the end of July.

Construction of the ground level slab has commenced and all is progressing as it should be.

Please see photos attached of the piling works in progress as well as the ground floor slab construction in process.

We will endeavour to provide you with further updates as construction progresses.

+ View More

Luar

22-24 Pakington Street
St Kilda
Builder:Drakk Constructions
Project Manager:David Parsons
Anticipated Completion Date:Early - mid 2020
Anticipated Settlement:Early - mid 2020

Project Update

August, 2019

The developer is pleased to advise that they have engaged Drakk Constructions to build Luar apartments and for the past month, work has been ongoing.

Over the past month there has been a large amount of contaminated soil removed from the site, which is a time consuming and expensive process given the testing, tip fees etc involved. This is almost complete.

The developer is also please to advise that they have finished detailed design of the basement retention system and are now awaiting any comments from neighbours before commencing these works on site around the end of the month.

Please note that with regards to purchaser variation requests: the builder is now busily evaluating and costing purchaser changes and we hope to get back to you soon.

Construction to be complete Q3 2020

We will further update this page in due course. Thanks for your patience.

 

 

+ View More

Malvern Residences

1186-1188 Malvern Rd
Malvern
Builder:Cobild
Project Manager:TBA
Anticipated Completion Date:May 2020
Anticipated Settlement:May 2020

Project Update

July, 2019

As a matter of update we can report that Cobild Construction site works progress is advancing well. Concrete structure works for basement level 1 and 2, and ground floor slab is complete. Level one concrete pour is occurring from next week.

Refer to most recent external photos attached.

Anticipated completion is expected in May 2020.

Quarterly updates to come.

+ View More

McKinely Residences

171 Wattletree Road
Malvern
Builder:Ironside
Project Manager:Pomeroy Pacific
Anticipated Completion Date:October 2019
Anticipated Settlement:November 2019

Project Update

September, 2019

Welcome to the September update for McKinley Residences.

Construction is progressing well, with the main facade elements now close to completion.

With the completion of the external facades, external landscaping works are set to commence in the coming weeks.

Internally, the timber flooring is now installed in the apartments and carpet installation is commencing on the ground floor apartments.

Joinery is currently being installed in the kitchens and bathrooms, with protective covering installed to avoid any potential damage. Construction completion is currently anticipated to occur by end October 2019, with settlement to follow shortly thereafter in November.

Please note that the above anticipated timing is subject to favourable conditions or unforeseen delays. We will continue to provide you with regular construction updates leading up to settlement.

Please understand that an exact settlement date cannot be provided until the Plan of Subdivision has been registered and the Certificate of Occupancy achieved.

We anticipate to commence Bank Valuation inspections in late October. We will advise further once exact dates have been confirmed.

Please see the most recent photo of McKinley Residences attached.

Please understand that an exact settlement date cannot be provided until the Plan of Subdivision has been registered and the Certificate of Occupancy achieved.

Settlement Solutions will be in touch again soon. In the meantime, please do not hesitate to contact Katrina from Property Settlement Solutions on 03 8582 8975 or email katrina@settlement-solutions.com.au.

 

+ View More

Melfort

496 Glenferrie Road
Hawthorn
Builder:TBA
Project Manager:TBA
Anticipated Completion Date:December 2020
Anticipated Settlement:December 2020

Project Update

September, 2019

We are currently in the sales and marketing phase.

Whilst sales are occurring the development team is in discussions with builders and banks to bring Melfort to life.

Construction updates will be provided quarterly.

+ View More

Newman

2 Newman Ave
Carnegie
Builder:Steller
Project Manager:Steller
Anticipated Completion Date:End 2019
Anticipated Settlement:Early 2020

Project Update

September, 2019

Construction continues to progress well and on schedule.

Completion is anticipated in the later part of 2019, settlement anticipated the beginning of 2020. Please see updated photos.

Further construction updates will be provided quarterly.

Olea

50 Kambrook Road
Caulfield North
Builder:TBA
Project Manager:BNG Group
Anticipated Completion Date:Q1 2021
Anticipated Settlement:Q1 2021

Project Update

August, 2019

Demolition is currently underway and will continue throughout the month of September.

The tendering process for a builder is soon to commence and we should be able to make an announcement about this in due course.

Estimated completion is Q1 2021.

Construction updates will be provided quarterly.

+ View More

Parkfield

88 Dunblane Rd
Noble Park
Builder:Saw Constructions
Project Manager:BHC Property
Anticipated Completion Date:Late September 2019
Anticipated Settlement:October 2019

Project Update

August, 2019

At this stage construction completion at Parkfield is anticipated to occur in late September/early October 2019.

We are pleased to provide you with the progress achieved on site so far.
– The scaffold is removed this week.
– United Energy Statement of Compliance has been issued.
– South East Water Statement of Compliance has been issued.
– Currently doing internal fitting & fixture.

The builders are working very hard to deliver beautiful homes for all the purchasers. Construction is towards its final stage and we understand the excitement for purchasing a new property.

In preparation for the handover of your brand new townhouse at Parkfield, we would love to take this opportunity to introduce you to the Settlement team and provide you with some helpful tips to ensure that the Settlement of your new townhouse is as smooth as possible.

Property Settlement Solutions has been appointed by the developer to manage the settlement and handover process of your new townhouse and will be your point of contact going forward. They will provide access for bank valuers to conduct valuations and accompany purchasers to your pre-settlement inspection.

They are also able to assist you with any general enquiries in relation to handover and/or settlement.
For legal matters you must continue to liaise with your solicitor/conveyancer.

Please do not hesitate to contact Monique from Property Settlement Solutions on 03 8582 8972 or email monique@settlement-solutions.com.au.

+ View More

Parq

134-138 McKinnon Road
McKinnon
Builder:Fynnan Construction
Project Manager:Oxford Developments
Anticipated Completion Date:Q1 2021
Anticipated Settlement:Q1 2021

Project Update

September, 2019

We are currently in the sales and marketing phase.

Whilst sales are occurring the development team is in discussions with builders and banks to bring Parq McKinnon to life.

Construction updates will be provided quarterly.

 

+ View More

Plant & Malvern

1199-1207 Malvern Road
Malvern
Builder:Cobuild
Project Manager:Hub Property Group
Anticipated Completion Date:Mid 2020
Anticipated Settlement:Mid 2020

Project Update

August, 2019

We are currently in the sales and marketing phase.

Whilst sales are occurring the development team is in discussions with builders and banks to bring Plant & Malvern to life.

Construction updates will be provided quarterly.

 

+ View More

Regent (Paddington Lane)

3 Whitehorse Road
Blackburn
Builder:TBC
Project Manager:Charter Keck Cramer
Anticipated Completion Date:End of 2020
Anticipated Settlement:End of 2020

Project Update

September, 2019

The developer is currently out to tender for a builder and anticipates having awarded the contract to the successful builder by the end of September.

On site, civil works are re-scheduled to commence in the next 2 weeks. The retaining wall to the northern wall (in the backyard of the townhouses) will be constructed first.

We will be able to advise further details including site progress photos in the next few weeks

For further information please contact Chris Valcanas on 8102 8912 / email christopher.valcanas@charterkc.com.au or Tselyn Lim​ 8102 8987 / tselyn.lim@charterkc.com.au

 

+ View More

Royal Ascot

2 Mascoma Street
Ascot Vale
Builder:Marcus Group (A subsidiary of ABD Group)
Project Manager:Pomeroy Pacific
Anticipated Completion Date:Mid 2020
Anticipated Settlement:Mid 2020

Project Update

June, 2019

Please find below the latest Construction update from the Project Manager on the current and future construction status for the development known as Royal Ascot.

Basement Level 2 structure has now been completed with Level 1 Basement set for completion early next week. This will finalise basement structure works.

We are forecasting the construction of the ground floor slab to commence the early/mid/late July with each additional level taking approximately 1 month to complete thereafter.

Subject to any unexpected delays, we are still forecasting overall completion by the end of May 2020.

Please also note that there is a construction camera installed opposite the site which is relaying real time photo’s online. The ‘construction camera’ can be viewed anytime at https://www.royalascotresidences.com.au/.

+ View More

Shuter Street

9 Shuter Street
Moonee Ponds
Builder:Balmain & Co
Project Manager:CDG
Anticipated Completion Date:February 2020
Anticipated Settlement:March 2020

Project Update

July, 2019

As we enter the latter half of 2019, we are pleased to report that Construction is progressing seamlessly with the major milestone of concrete structure complete.

The main exterior of the building is taking shape and the estimated practical completion is February 2020.

We look forward to updating you further on the next milestone in the near future.

Construction updates are provided quarterly.

+ View More

St James Park

1A Yarra St
Hawthorn
Builder:Marcus Group
Project Manager:TBA
Anticipated Completion Date:Q3 2020
Anticipated Settlement:Q3 2020

Project Update

July 2019,

It is an exciting time for future residents of St James Park, with a number of important milestones completed or underway. In February this year, Marcus group was officially appointed as the partner builder for St James Park.

Demolition commenced in early May, with completion of both demolition and retention works expected in July. With these early construction works underway we are on-track to meet our completion target for quarter four, 2020.

Further information and site pictures to come in due course.

 

+ View More

Surrey Gardens

288 Canterbury Road
Surrey Hills
Builder:Stosius Constructions
Project Manager:Nicky Keating
Anticipated Completion Date:Late 2020
Anticipated Settlement:Late 2020

Project Update

September, 2019

We are pleased to advise that work on the site commenced at the end of last month- a few photos of the site are provided.

The expected build time is approx. 16 – 18 months.

We will update purchasers further in due course.

+ View More

Tailor

481-491 Victoria St
West Melbourne
Builder:TBA
Project Manager:TBA
Anticipated Completion Date:Late 2020
Anticipated Settlement:Late 2020

Project Update

August, 2019

We are currently in the sales and marketing phase.

Whilst sales are occurring the development team is in discussions with builders and banks to bring Tailor to life.

Construction updates will be provided quarterly.

+ View More

The Anderson

791-795 Toorak Road
Hawthorn East
Builder:Cobild
Project Manager:Intrax
Anticipated Completion Date:August 2019
Anticipated Settlement:September 2019

Project Update

August, 2019

We are pleased to advise that the Project has reached practical completion and that the occupancy permit has been issued by the building surveyor.

As for the plan of subdivision, the development team is working hard to satisfy all the relevant conditions so that a Statement of Compliance could be obtained as soon as practicable. At this stage, most of the conditions have been satisfied.

We aim to complete this process in early September and we forecast the  settlement of The Anderson will be taken place in mid-September.

Once the settlement date is confirmed, Vendor’s solicitor will notify your solicitor with two weeks’ notice.

For any enquiries relating to settlement, please feel free to contact the Settlement Team as follows:

Amanda      amanda@upssettlement.com.au   +61 413 115 380

Felicia          felicia@upssettlement.com.au       +61 450 706 566

+ View More

The Kent

382 Burwood Rd
Hawthorn
Builder:Cobild
Project Manager:HS Consortium
Anticipated Completion Date:Early 2020
Anticipated Settlement:Early 2020

Project Update

August, 2019

We are excited to let you know that a construction milestone has been achieved in that the basement works are now complete and work is now progressing rapidly above ground.

The level 1 concrete slab is now in place and a new level will be constructed approximately every 2 weeks.

There has been some delay in the construction program due to excavation of rock and wet weather which has extended the expected completion date (not settlement) to July 2020.

We will continue to keep you updated with construction progress.

It is very important to note that The Kent is now a construction site under the control of the builder, and there is no access allowed.

Purchasers are strongly advised not to visit the site on their own account or to attempt to enter it. This is for your own safety.

We look forward to sharing further updates next quarter. In the meantime, please do not hesitate to contact Monique from Property Settlement Solutions on 03 8582 8972 or email monique@settlement-solutions.com.au.

+ View More

The Porter

1375 Burke Road
Kew East
Builder:KPA Property
Project Manager:Cold Fusion Capital
Anticipated Completion Date:October 2019
Anticipated Settlement:October 2019

Project Update

September, 2019

We are pleased to report that works are carrying on well onsite and the building is heading towards completion, with the builders focussing on the completion off the common areas, final external elements and finishing touches to the internal fit-out of the apartments. Flooring and internal tiling is complete, joinery is 80% complete and the Stone and appliances should be installed in the coming weeks.

As such we are pleased to advise that, if required, banks valuers will be invited onto site to conduct valuations from the last week of September.

This inspection is for banks valuers only; for those of you requiring a bank valuation for financing purposes.

Project Timing

The Builders have advised that the construction completion (not settlement) is anticipated for early/mid October 2019, with settlement to occur thereafter.

Please note that the above anticipated timing is subject to favourable conditions and does not take into account any unforeseen delays.

Please also understand that settlement cannot be triggered until the Plan of Subdivision has been registered and the Certificate of Occupancy achieved.

If you have any issues in regards to your purchase, please do not hesitate to contact Katrina from Property Settlement Solutions on 03 8582 8975 or email katrina@settlement-solutions.com.au with any questions that you may have.

We will ensure to keep you updated as construction progresses and we near settlement.

 

+ View More

The Royal

670-676 Glen Huntly Road
Caulfield South
Builder:Buildcept
Project Manager:TBA
Anticipated Completion Date:September 2019
Anticipated Settlement:September 2019

Project Update

September, 2019

We are pleased to advise that building works are progressing well at The Royal. All scaffolding has been removed and carpet installations are due to commence soon.

Settlement Timeline:

Settlement will occur once Titles have been registered with the Land Titles Office and the Occupancy Permit has been issued.
We anticipate both the issuance of the Occupancy Permit and Registered Titles later this month, with settlement anticipated shortly after.
Please refer to your Contract of Sale to identify your settlement period once both items are achieved.

Valuation Inspections:

Bank valuation inspections are likely to commence from the 19th of September. Once we have received confirmation of time allocations from the project team, an email will be sent out with booking procedures.
If you would like your bank or broker’s to be included in the email, please send our team their contact details so that we can include them in the email.

Purchaser Inspections:

Purchaser inspections are due to occur during the week of the 23rd of September.
These inspections are an opportunity for you (or an authorised representative) to inspect your apartment prior to settlement. Inspections are by appointment only.
We will issue a formal notification with booking instructions and inspection details later next week.

For further photos and information between communications, you can follow the journey at the Instagram account
@the_royalcaulfield.

If you have any other questions, please do not hesitate to contact the Settlement Team using details below.

The Royal – Settlement Team
settlements@cintcorp.com.au
0401 421 682

+ View More

Verse

18 -28 Wilkinson Road
Sunshine
Builder:Rise Constructions
Project Manager:Paragon Development Group
Anticipated Completion Date:Early 2021
Anticipated Settlement:Early 2021

Project Update

August, 2019

Civil Works to commence shortly.

Further information to be provided in due course.

Viola

390 Upper Heidelberg Road
Ivanhoe
Builder:JG King Projects
Project Manager:Nash Management
Anticipated Completion Date:Late 2019
Anticipated Settlement:Late 2019

Project Update

September, 2019

We are pleased to pass on the following update from the Developer:

We are rapidly approaching practical completion on the build. For purchasers who intend to bank finance their purchase, we suggest that you maintain open dialogue with your financiers. Should you need anything from Polis, please contact us immediately to ensure we can promptly assist.

Settlement Information

Below is an anticipated outline of settlement details for your Viola Townhome.

Mid-late October: Practical Completion of building/ construction

Early November: Settlement triggered and titles released. Purchasers will have the ability to settle early or 14 days after registration of plan of subdivision / certification of occupancy

Late October: Authority sign off (Council Statement of Compliance, utilities, occupancy certificate).

This is intended to provide an indicative timeline and brief overview of the next few weeks.

We are on track for a mid-to-late October practical completion of construction. After construction is completed, a number of steps will take place prior to settlement and exchange of titles. This primarily includes sign off by building authorities and registration of title.

The exact period depends upon the speed with which authorities sign off on documentation. In our experience, this process takes approximately 2 weeks from practical completion. Although we do not foresee any delay with this process, we have factored in some additional time within the timeline in case of the unexpected.

Once settlement is triggered, your contract stipulates 14 days for settlement. During this period, you will have the option to settle early.

Construction Progress

August saw the construction focus shift to internal work, as the cladding installation nears completion.

Joinery has now been installed to most of the townhouses, with the last remaining lots scheduled for installation of robes and kitchens in the coming days. Plastering has also been completed on all townhouses followed by the first coat of paint. Once the last of the cladding is installed, the scaffolding will be removed and the internal fences and landscaping will begin.

Flooring is scheduled to be installed over the next two weeks. This will see the insides of the townhouses visually transform. The benchtops and appliances will be the last of the work to take place as the townhouses are prepared for the first of the purchaser inspections.

+ View More

Westend (Adderly, The Foundry, Spencer, Mailhouse)

185 Rosslyn Street
West Melbourne
Builder:Hacer
Project Manager:Urban
Anticipated Completion Date:Mid-late 2020
Anticipated Settlement:Mid-late 2020

Project Update

August, 2019

We are pleased to advise that construction is well underway and on program thanks to the strong management and teamwork of our builder, project manager and consultant team lead by Hacer and Urban Project Management.

We are pleased to advise that based on the current construction performance and weather conditions, we can provide an indication of construction completion and settlement dates as follows:

Settlement Dates Construction Completion Proposed Settlement Date
Building 2 – Adderley Aug-20 Sep-20
Building 3 – Mailhouse Sep-20 Oct-20
Building 4 – Foundry Early Jul-20 Late Jul-20
Building 5 – Spencer Nov-20 Nov-20
Building 1 – Adina Hotel Jul-20 Trading from Aug 20

The developers have installed a camera on site which is taking photos every 15 minutes and another camera taking a photo of the entire site every day at 1pm. Please view this here for the most recent pics.

http://www.cloud9.camera/WestEndApt#

Please ready yourselves as we on the Development Team have all begun to do, by planning for settlement of your home next year. Further construction updates to follow in due course.

+ View More

Windsor Terrace

168 High Street
Prahran
Builder:Balmain Construction
Project Manager:Hub Property Group
Anticipated Completion Date:July 2019
Anticipated Settlement:August 2019

Project Update

July, 2019

We are thrilled to advise that the Project is complete and your legal representative should have now been sent a letter advising of your upcoming settlement.

Please ensure you are ready and that your legal representative books in your settlement date, with the developers solicitor, in order to avoid any late penalty interest.

If you have any queries or concerns regarding your settlement, please contact Kim on kim@settlement-solutions.com.au or call 03 8582 8979.

+ View More

For further enquiry or any issues, please contact:

Amy Bennison
Email : amy.bennison@marshallwhite.com.au
phone : 03 9832 1278

Please note our Concierge office hours are:

9.30 – 4.30pm on Tuesdays and Thursdays, and from
9.30 – 3pm on Fridays.

Please leave this field empty.

X

Please leave this field empty.

X

Register for instant email alerts when a property matches your criteria.